Project overview*

EIS status EIS active
Description Greenfield metallurgical coal mine with a yield of up to 8 million tonnes of product coal for approximately 30 years, for steel production.
Proponent Whitehaven WS Pty Ltd, a wholly owned subsidiary of Whitehaven Coal
Location/s Approximately 30 km south-east of Moranbah. Map
Local government/s Isaac Regional Council
Investment $1 billion
Key features
  • open-cut metallurgical coal mine
  • mine infrastructure areas including workshops and a coal handling and preparation plant
  • rail loop and train load out facility
  • private access road
  • raw water pipeline connecting to the Eungella pipeline network
  • electricity transmission line from the existing power network
  • on-site temporary construction accommodation camp
Construction start date 2021
Jobs
  • 500 (construction)
  • 450 (operational)

* Project information supplied by proponent and subject to change.

Have your say

Queensland's Coordinator-General invites you to have your say on the draft terms of reference (TOR) for an environmental impact statement (EIS) for the Winchester South project.

The Coordinator-General will consider all comments made on the draft TOR before finalising the TOR.

The proponent is then to prepare a draft EIS in accordance with the final TOR. Once the Coordinator-General has considered that the draft EIS is acceptable for public notification, the draft EIS will be made available for public comment.

Submissions close 5 pm on 19 July 2019.

Make a submission on the draft TOR.

Environmental impact statement (EIS) process

Date Activity
24 June 2019 to 19 July 2019 Draft terms of reference (PDF icon1.2 MB) for EIS public consultation.
14 May 2019 Project referred to Commonwealth Minister for the Environment.
17 April 2019 Gazettal (PDF icon 247 KB) of ‘coordinated project’ declaration.
14 February 2019 Application, including initial advice statement (PDF icon 8.8 MB), submitted.

Read more about the EIS process.